Ex p
How it works
1) Initial purge: before power is applied, protective gas (air or nitrogen) is passed through the enclosure, exchanging a multiple of the free enclosure volume to remove any explosive atmosphere. 2) Pressure build-up: the system maintains an overpressure relative to the surroundings (typically at least on the order of 50 Pa), which blocks external gas ingress. 3) Monitoring: pressure/flow sensors continuously supervise the overpressure; if leakage occurs, the protective-gas supply is increased to compensate. 4) Safety interlocks: a drop in overpressure below the threshold triggers an alarm and, depending on type and zone, an automatic power cut-off. Type px reduces Zone 1 to a non-hazardous area, py reduces Zone 1 to Zone 2, and pz reduces Zone 2 to a non-hazardous area.
Problem solved
It addresses how to safely operate equipment that cannot practically be built as intrinsically safe or flameproof — such as high-power electronics, industrial computers, drives and robots — in hazardous areas. Instead of redesigning every subcomponent, it isolates the whole enclosure interior from the explosive atmosphere.
Implementation
Powering the equipment before the protective gas has exchanged the required number of volumes leaves an explosive atmosphere inside.
A drop in overpressure (e.g. via leakage or protective-gas supply failure) without detection allows the explosive atmosphere to enter an energized enclosure.
Using nitrogen as the protective gas displaces oxygen; opening the enclosure or a leak in a confined space risks asphyxiation of service personnel.
Hyperparameters (configurable axes)
Overpressure of protective gas maintained inside the enclosure relative to the surroundings; blocks ingress of the explosive atmosphere.
Medium used to create the overpressure and purge: clean instrument air or an inert gas (nitrogen).
Number of free-enclosure-volume exchanges with protective gas before energization is permitted.
Pressurization type per 60079-2 determining the level of zone-hazard reduction.
Continuous protective-gas supply compensating inevitable enclosure leakage to keep the target overpressure.